BRIDGE BUILDING
Make the bridge to success
Regulations
Teams must submit their bridge half hour before the competition for inspection. Teams will be given 15 minutes to modify bridges which do not pass inspection.Bridges will then be subjected to loading. Bridge failure will be considered the point at which the bridge breaks.
|
Rules
  • ● Team of 4 Participants.
  • ● Bridge should be made of any type (suspension bridge, cable bridge,cantilever bridge, truss bridge, arch bridge etc.)
  • ● sticks used 350
  • ● Only Popsicle sticks, thread and fevicol should be used for building a bridge.
Register
Dakshaa_T23
All Rights Reserved | Copyright ©2023 | Website By  
Department of Information Technology